TG20 compliance sheets: keep the right record with the job

Understand the role of a TG20 compliance sheet, keep the current document with the scaffold, and distinguish a proposal model from design evidence.

Use the document for the particular scaffold

A compliance sheet is specific to the scaffold and its conditions. NASC explains that the eGuide assesses site wind exposure and selects an appropriate compliance sheet, with additional sheets for applicable add-on features. The person producing it needs suitable competence.

Do not turn a sample sheet, a screenshot or a general list of dimensions into a design rule for every job. Use the current guidance and the correct information for the actual scaffold.

Keep proposal images and design records distinct

A 3D quotation model helps explain the proposed scope. It is not, by itself, evidence that the scaffold satisfies the required design checks. Keep the applicable design or compliance documents identifiable within the project records.

HSE advises that a scaffold needs a recognised standard configuration or a design established through calculation by a competent person. Inform those responsible for the design and erection before adding sheeting or debris netting.

Make the current version easy to find

Record the scaffold reference, document date and the version the team should use. If the arrangement or conditions change, ensure the appropriate person reviews the documentation rather than assuming an earlier sheet still applies.

Connect the relevant document to the job alongside the handover and inspection records. Clear filing helps people find the evidence; it does not replace the checks themselves.

Read the primary guidance

Use the current NASC guidance and HSE information for the design and competence requirements. Ask the person responsible for the scaffold design when the configuration needs further assessment.

NASC: competence required to produce compliance sheets
HSE: scaffolds